Connect your data center faster.

The grid connection now takes longer than the build. We size your site's flexibility at design stage. It becomes a connection the grid operator can grant sooner.

200 h
of grid stress per year on a flexible connection
The constraint

The grid needs flexibility a few hours a year.

Building a data center takes about 2 years. Connecting it takes 5 to 7 years in Europe, up to 10 in the US. A flexible connection limits consumption only during grid stress hours, and can be granted sooner.

How it works

From flexibility to a faster connection.

/1

Study.

Model which loads can shift, and for how long.

/2

Forecast.

Forecast how often grid stress occurs at your site.

/3

Contract.

Negotiate a connection limited only in grid stress hours.

What you get

Three deliverables, before construction ends.

/1

Flexibility study.

Load profile, shiftable share and operational constraints of the future site.

/2

Connection contract terms.

Hours, consumption levels and notice the site can commit to, ready for the grid operator.

/3

Operating plan.

How Nodera's grid-aware scheduler will respect these terms once the site runs.