The grid connection now takes longer than the build. We size your site's flexibility at design stage. It becomes a connection the grid operator can grant sooner.
Building a data center takes about 2 years. Connecting it takes 5 to 7 years in Europe, up to 10 in the US. A flexible connection limits consumption only during grid stress hours, and can be granted sooner.
Model which loads can shift, and for how long.
Forecast how often grid stress occurs at your site.
Negotiate a connection limited only in grid stress hours.