Your data center is live. Our scheduler sees grid stress coming 72 hours ahead. Your team is notified early. Flexible workloads shift with minimal disruption, and your electricity bill goes down.
Grid operators signal stress minutes before the event. Nodera notifies you up to 72 hours ahead, on a rolling basis, and the scheduler plans over that whole window. Workloads shift gradually instead of stopping abruptly.
Our scheduler moves flexible jobs out of stress hours, within your service levels and your connection contract.
Value that flexibility in your electricity supply contract, without reducing volumes.
Grid stress hours at your site, 72 hours ahead, rolling. Your team is notified as soon as an event is forecast.
Score each workload by how far it can move while meeting its deadline and constraints.
The scheduler plans over a rolling 72-hour window to disrupt operations as little as possible.